Back to work
In buildMulti-month build · 6 modulesBent Construction
Bent PM Tool
A custom PM tool replacing Procore for a California GC, shipped module by module.
The problem
Bent's PMs were spending hours every day fighting Procore for routine tasks — drawing markup, spec lookups, submittal status. The off-the-shelf tool fit a generic GC, not theirs. We're rebuilding it around how their crew actually works, one module at a time, on a 16-week migration plan.
What we built
- Discovery program: 6 PM/super interviews, workflow cards for every job role, six-module-group architecture
- Module 1 — Drawings, Specs, Documents: live prototype with circle-to-spec, audits, cloud watcher, one-way sync
- Module 2 — Submittals + RFIs: in build, demo this week
- Migration plan: 9-phase, 16-week rollout from Procore to the new stack with zero job downtime
Signal
- PM Tool live in pilot ahead of Module 2 demo
- Client signed off on Module 1 PRD; committed to Module 2 scope
More work
See allOther things we've built or can build
Shipped · Single delivery · running in production
Material orders timed to the schedule, not to the buyer's memory.
1-2 weeks per GC
Material Purchase SchedulerRead case →
Shipped · Methodology · used on every project
Discovery in days, not quarters — driven by AI, grounded in operator interviews.
2-3 weeks per project
AI Product Researcher (Brain Sketch)Read case →
Concept
Stop losing submittals in email. Track every RFI from open to closed.
1-2 weeks
Submittals + RFI CoordinatorRead case →